Tesco Berwick Packaged Plantroom

Client: LX Engineering Ltd

Description of Works
To manufacture and deliver to site 1 No. Fully enclosed containerised Plant room to supply LTHW to Tesco Berwick. The plant room contains Pumps, Boilers, Booster Set, Calorifier, Water Tank, Valves, etc.

The Packaged Plantroom has been manufactured by EllisonAC Packaged Plant Solutions as a two piece unit overall size 7,500mm long x 3,750mm wide x 2,992mm high to the peak.